The total cut off of road traffic in C / Cetti Meriem (section between C / Gran Vía and the entrance gate of the Parking) will be from 05/18/21 to 08/31/22. Consult planning.
The term of validity to carry out the total cut off of the road traffic in C / Cetti Meriem (section between C / Gran Vía and the entrance gate of the Parking) on the occasion of the operations of loading and unloading of materials, will be from 05/18/21 to 08/31/22, will be carried out in accordance with the following work phases:
Only the minimum time necessary to carry out the loading operations and discharge having to reopen the street once they have finished, also having to leave in at all times and as long as the work allows free access to the garages located on the street.