Center for the Complete Management of Mobility in the City of Granada in English

Home  :  Sanitation works from Padre Marcelino to Gonzalo Gallas streets

Sanitation works from Padre Marcelino to Gonzalo Gallas streets

Traffic cuts needed in the path of this infrastructure (Padre Marcelino, Recoletos and Pérez Galdós streets) from 14 January to 30 April 2019.

Phase 1: Recoletos St. (btweeen Padre Marcelino and Santo Tomás de Villanueva streets).- From 14/1/19 to 31/1/19. Phase 2: Recoletos St. (between Santo Tomás de Villanueva and María Guerrero St.).- From 29/1/19 to 14/2/19. Phase 3: Connection from Recoletos St. to Padre Marcelino St.- From 11/2/19 al 15/2/19. Phase 4: Padre Marcelino St.(between Recoletos and Escritor Perrault St.).- From 13/2/19 to 27/2/19. Phase 5: Recoletos St.(between María Guerrero and Ilusión Square).- From 12/2/19 to 5/3/19. Phase 6: Pérez Galdós St.(exit to Camino de Ronda).- From 25/2/19 to 15/3/19 and from 4/4/19 to 15/4/19. Phase 7: Pérez Galdós St.(between Ilusión Square and Arabial St.).- From 4/3/19 to 18/3/19. Phase 8: Pérez Galdós St.(junction with Arabial St.).- From 14/3/19 to 22/3/19. Phase 9: Pérez Galdós St.(between Arabial and Camino de Ronda).- From 20/3/19 to 5/4/19. Phase 10: Camino de Ronda (traffic unaffected in Camino de Ronda).-From 28/3/19 to 2/4/19. Phase 11: Pérez Galdós St.(access from Camino de Ronda to Gonzalo Gallas St.).- From 25/3/19 to 26/3/19. Phase 12: Pérez Galdós St.(between Camino de Ronda and Gonzalo Gallas St.).- From 3/4/19 to 15/4/19. Phase 13: Gonzalo Gallas St.(junction with Pérez Galdos St.).- From 11/4/19 to 30/4/19.


Emasagra ha desarrollado el siguiente mapa en el que se podrán ir viendo los desvíos y cortes de tráficos asociados a la obra:

Location


Twitter cgimgranada Facebook Youtube Telegram Instagram