Traffic cuts needed in the path of this infrastructure (Padre Marcelino, Recoletos and Pérez Galdós streets) from 14 January to 30 April 2019.
Phase 1: Recoletos St. (btweeen Padre Marcelino and Santo Tomás de Villanueva streets).- From 14/1/19 to 31/1/19. Phase 2: Recoletos St. (between Santo Tomás de Villanueva and María Guerrero St.).- From 29/1/19 to 14/2/19. Phase 3: Connection from Recoletos St. to Padre Marcelino St.- From 11/2/19 al 15/2/19. Phase 4: Padre Marcelino St.(between Recoletos and Escritor Perrault St.).- From 13/2/19 to 27/2/19. Phase 5: Recoletos St.(between María Guerrero and Ilusión Square).- From 12/2/19 to 5/3/19. Phase 6: Pérez Galdós St.(exit to Camino de Ronda).- From 25/2/19 to 15/3/19 and from 4/4/19 to 15/4/19. Phase 7: Pérez Galdós St.(between Ilusión Square and Arabial St.).- From 4/3/19 to 18/3/19. Phase 8: Pérez Galdós St.(junction with Arabial St.).- From 14/3/19 to 22/3/19. Phase 9: Pérez Galdós St.(between Arabial and Camino de Ronda).- From 20/3/19 to 5/4/19. Phase 10: Camino de Ronda (traffic unaffected in Camino de Ronda).-From 28/3/19 to 2/4/19. Phase 11: Pérez Galdós St.(access from Camino de Ronda to Gonzalo Gallas St.).- From 25/3/19 to 26/3/19. Phase 12: Pérez Galdós St.(between Camino de Ronda and Gonzalo Gallas St.).- From 3/4/19 to 15/4/19. Phase 13: Gonzalo Gallas St.(junction with Pérez Galdos St.).- From 11/4/19 to 30/4/19.
Emasagra ha desarrollado el siguiente mapa en el que se podrán ir viendo los desvíos y cortes de tráficos asociados a la obra: